Paper
23 September 2013 Landsat Data Continuity Mission, now Landsat-8: six months on-orbit
Author Affiliations +
Abstract
The Landsat Data Continuity Mission (LDCM) with two pushbroom Earth-imaging sensors, the Operational Land Imager (OLI) and the Thermal InfraRed Sensor (TIRS), was launched on February 11, 2013. Its on-orbit check out period or commissioning phase lasted about 90 days. During this phase the spacecraft and its instruments were activated, operationally tested and their performance verified. In addition, during this period, the spacecraft was temporarily placed in an intermediary orbit where it drifted relative to the Landsat-7 spacecraft, providing near simultaneous imaging for about 3 days, allowing data comparison and cross calibration. After this tandem-imaging period, LDCM was raised to its final altitude and placed in the position formerly occupied by Landsat-5, i.e., 8 days out of phase with Landsat-7, with about a 10:10 AM equatorial crossing time. At the end of commissioning, the satellite was transferred to the United States Geological Survey (USGS), officially renamed Landsat-8 and declared operational. Data were made available to the public beginning May 31, 2013. The performance of the satellite and two instruments has generally been excellent as evidenced in the quality of the distributed data products.
© (2013) COPYRIGHT Society of Photo-Optical Instrumentation Engineers (SPIE). Downloading of the abstract is permitted for personal use only.
Brian L. Markham, James C. Storey, and James R. Irons "Landsat Data Continuity Mission, now Landsat-8: six months on-orbit", Proc. SPIE 8866, Earth Observing Systems XVIII, 88661B (23 September 2013); https://doi.org/10.1117/12.2025290
Lens.org Logo
CITATIONS
Cited by 6 scholarly publications.
Advertisement
Advertisement
RIGHTS & PERMISSIONS
Get copyright permission  Get copyright permission on Copyright Marketplace
KEYWORDS
Earth observing sensors

Landsat

Sensors

Calibration

Satellites

Signal to noise ratio

Space operations

Back to Top