After having completed the phase B (front-end design) of the several subsystems, the E-ELT project is entering into the construction phase. The subsystems specifications, interface control documents and accompanying technical documentation resulting from the said design activities are being drafted along with the statements of work needed for the tendering processes. This paper presents an overview of the Systems Engineering Plan for the construction phase focusing on the specific systems engineering processes. The goal is to ensure that this phase is developed following an efficient systems engineering approach based on the lessons learned during phase B. The ultimate objective is that the E-ELT meets the science requirements defined by the users while the risk of overruns in cost or schedule, which might otherwise originate from the lack of a system perspective, is minimized.
© (2014) COPYRIGHT Society of Photo-Optical Instrumentation Engineers (SPIE). Downloading of the abstract is permitted for personal use only.
J. C. Gonzalez, H. Kurlandczyk, and D. Schneller "Systems engineering plan for the construction phase of the E-ELT", Proc. SPIE 9150, Modeling, Systems Engineering, and Project Management for Astronomy VI, 91500U (4 August 2014); https://doi.org/10.1117/12.2055188
Advertisement
Advertisement
RIGHTS & PERMISSIONS
Get copyright permission  Get copyright permission on Copyright Marketplace
KEYWORDS
Systems engineering

Document management

Control systems

Domes

Telescopes

Inspection

Chromium

RELATED CONTENT

E-ELT requirements management
Proceedings of SPIE (August 04 2014)
E-ELT requirements flow down
Proceedings of SPIE (August 18 2016)
Advanced Technology Solar Telescope project management
Proceedings of SPIE (August 04 2010)
Quality management in the GTC project
Proceedings of SPIE (August 25 1998)

Back to Top